Tahoe Resources Inc - Toronto Stock Exchange and New York Stock Exchange

Operations

Tahoe Resources Inc

Escobal Mine

The Escobal mine is located in southeast Guatemala, approximately 40 km east-southeast of Guatemala City. The deposit is an intermediate-sulfidation silver-gold-lead-zinc vein deposit hosted in Tertiary andesite and volcaniclastic sedimentary rocks. Continuous precious- and base-metal mineralization extends over wide (10m to locally 50m) zones defined over 2,400m laterally and 1,200m vertically.

Escobal Mine Details
Tahoe Resources Inc La Arena Mine

La Arena Mine

The La Arena gold mine is located in northern Perú, 480 km north-northwest of Lima. The mine consists of two types of mineral deposits: high-sulfidation epithermal oxide gold mineralization hosted in brecciated sandstone within the Chimu Formation, and copper-gold sulfide mineralization hosted in multi-stage porphyry drill/blast intrusives.

La Arena Mine Details
Shahuindo Mine

Shahuindo Mine

The Shahuindo gold mine is located in a prolific gold producing belt in northern Perú, 30 km north of the La Arena mine. The deposit is an intermediate-sulfidation epithermal sediment-hosted gold deposit centered around a large amplitude fold intruded by felsic stocks. The project design is an open pit mine using conventional drill/blast, shovel and dump truck operations with heap leach processing.

Shahuindo Mine Details
Timmins West Mine

Timmins West Mine

The Timmins West mine is located approximately 18 kilometres west of Timmins, Ontario, one of the world’s most prolific gold camps. Mineralization is associated with the Porcupine-Destor fault system within the Abitibi greenstone belt. The Timmins West mine is comprised of the Timmins deposit, which has been in commercial production since January 2011, and the Thunder Creek deposit, which achieved commercial production in January 2012.

Timmins West Mine Details
Bell Creek Complex

Bell Creek Complex

The Bell Creek Complex, located approximately 20 kilometres northeast of Timmins, Ontario, consists of an underground mine and processing facility. Mineralization is associated with the Porcupine-Destor fault system within the Abitibi greenstone belt, with ore mined by longhole stoping methods and trucked to surface via a ramp system for processing. The current production rate from the Bell Creek mine is approximately 800 tonnes per day.

Bell Creek Complex Details

Tahoe Global Operations Map